CICU 5-Year Review Checklist

CICU 5-Year Review Checklist

Director of Center or Institute(Required)
CICU Oversight Authority Name(Required)
Second CICU Oversight Authority Name (if applicable)
Reviewer's Name(Required)
MM slash DD slash YYYY

Check List

For all questions, reviewer can provide notes as applicable.
Five-year self-study of C/I completed(Required)
[includes last five annual reports (with metrics reports), executive summary, and vision] *Until 2026 many CICUs will have less than five annual reviews.
Five-year self-study reviewed and approved by oversight authority/authorities(Required)
(includes support letter[s])
Includes most recent organization chart(Required)
(in last annual report)
Includes most recent budget overview(Required)
(in last annual report)
Metrics reports match what was established/agreed upon metrics and are tied to goals(Required)
If applicable, includes justification of failure to meet benchmarks and a self-correction plan(Required)
If applicable, any issues noted that RAC needs to resolve(Required)
Drop files here or
Max. file size: 146 MB.